Main stages of repair in the apartment.
How to start repair of the apartment?
The first phase of the repair of old apartments is the damage and dismantling first of all of the worn out walls and partition walls, getting rid of the wall and ceiling finishing. This stage is one of the most "unclean" stages of the repair.
One more amongst the most crucial and "dirty" works is the window block replacement. It is required to do this first of all since dirt and dust will be unallowable throughout following stages and it is forbidden at all to open windows throughout painting and wallpaper works (big drops of the temperature level and wetness are unallowable). After installing windows and windowsills it is necessary to pack them right away in polyethylene film and to cover windowsills in addition by the fiber board (in order to avoid scratches).
The following stage is circuitry. Wiring can be installed in walls or along the flooring. Electrical wiring is made inside the pipes to ensure electrical safety and boost dependability. The pipeline protects circuitry from external damages and permits to change the wire totally without breaking walls and flooring simply by inserting the brand-new wire instead of the old one.
House Painting follows the circuitry. The frequent mistake throughout the simultaneous conducting of such works takes place when employees forget to set out among the cable televisions and house painters have actually currently plastered and ravelled the wall. As an outcome, extra works are needed to seal chases after on the finished wall. The locations of the feed switch and wall outlet location and their number must be thought-out ahead of time. The plan of power electrical wiring is typically consisted of into the design project.
Later on the system need to be prepared to service in case of failures. In addition to the wirings, the telephone cable and the television cable are set out. The power cable ought to not be laid out near the telephone and antenna cable televisions to avoid noise pickup and interference. The most peculiar minute is setting out the TV cable. In order to make two (or three) television set in the apartment or condo the 2nd cable television is often just "strongly soldered" in parallel, so the cable television resistance is decreased. As a result, the screen quality is weakened, lots of programs can't be gotten and etc. In order to prevent such scenario it is essential to welcome a professional with unique equipment. He will measure the signal level of the each TV-feeder and install TV-amplifiers or TV-filters.
Painting is the most long-lasting process, that is why it is conducted simultaneously in all facilities, if it is possible. Hold-ups are linked with the technology. Each used layer of the plaster (or filling out completing) should dry entirely before the work will continue.
Works in hygienic arrangements and the cooking area start concurrently with house painting. It is better to satisfy so-called "filthy" works in the first place and all at once. In accordance with the strategy of the sanitary specialist location welding, wall chasing and pipe run are conducted. Steam radiator admissions are prepared, taps and brackets are mounted, however radiators are not installed.
Then operates in sanitary arrangements are conducted according to the plan. The bath is installed, then walls are smoothed out and the tile is laid on walls. The following stage is putting together ceiling and laying tiles on the flooring. And at last other sanitary gadgets, mixers and devices are mounted.
After wiring, setup of rosette plates and terminal boxes the voltage is signed in all point. Ends of wiring are insulated and set out into rosette plates. Sockets and breakers are not installed throughout this phase in order to save their surface area look. The surface puttying of walls is conducted simultaneously. The highly specific control of drying of the layer of the plaster (filling) is carried out by drymeter. It is a special instrument that determines moisture of the material.
After fill door boxes and door are installed. Installation of doors should take into the account density of future flooring covering. After installation the door can be taken off its hinges and got rid of up until completion of repair or packed into polyethylene movie to safeguard from damages. Simultaneously ceiling can be painted and the tile can be laid in that facilities where it was prepared. The tile should be laid on the definitely dry overlay.
Finishing of the floor installing depends upon the prepared covering. In most cases (if surface covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are fixed to the flooring by self-tapping screws. One plywood sheet is repaired by 30-50 self-tapping screws to supply the close fixing of plywood and long-lasting service of the floor without squeak and bulging. The plywood gives the extra heat- and acoustic insulation. After mounting of the plywood is finished, wallpaper for painting can be pasted on walls.
In premises where surface covering of the flooring is laminated flooring or parquet hoard, the common wallpapers are pasted (not for painting) in the very first location. Then the flooring covering is mounted.
If surface covering of the floor is the block parquet, the parquet is laid in the top place, then it is scraped and covered by one layer of lacquer. After this the common wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending on the quality of the parquet and lacquer). The mentioned consequence is connected only with such rushing procedure when the terrific quantity of dust is developed. In spite of the reality that great flooring grinders are geared up with the vacuum cleaner, the enough quantity of dust is sped up on surrounding topics including walls. Dust is extremely acerbic and is badly cleaned off. That is why in order not to damage wallpapers, they are pasted after rushing and in order the parquet do not take in the surplus moisture it is covered by the one layer of lacquer before wallpaper pasting.
After this the main works can https://tampatraining.instructure.com/eportfolios/894/Home/reasons-why-you-hire-a-plumber-for-leak-detection be thought about to be ended up. It is left just to install the plinths, ornamental elements, breakers and sockets, drape holders, to hang doors, plant-bands and others.
In conclusion it is required to note that the series of works was noted in basic and can change depending on the guaranteed situation-- the variety of rooms in facility, your resources, peculiarities of the building of the multilevel premises. It is based on common sense and everyone capable of analysis can individually produce such a sequence.